The anticipation of moving east to the little village of Stanley in south-eastern Australia was difficult to deal with at times; for too long I've looked forward to devoting the majority of my working days to building guitars!
Reality has bitten though, and the prospect of building - or having built - a purpose-built workshop seems a little further away since the verdict of our appointed building inspector was delivered on the house Sandi and I inspected during our scouting trip a few months ago. The building inspector's findings were off-putting to say the least, but not entirely unexpected given that we're downsizing in a serious way, and looking at properties whose age and condition is reflected in their low price tag!
The little rental property we've selected as a temporary home is cosy enough, and is at least located in the village we've committed to settling into. However, storage and working space is in short supply and the prospect of commencing any new guitars seems like a distant dream. There is hope, however, when I reflect on the fact that the woodworking aspect of the guitars I have under construction is complete, and the process of applying finish to them is at least within my grasp - weather permitting. It's unseasonably warm and dry at present and with the relative humidity outside plummeting to the low twenties through the day, I'm wary of submitting guitar bodies to such conditions for any length of time. Hopefully, this spell of warm weather won't last and I can prepare to spray some finish top-coats soon.
Short-beaked echidna - a recent visitor to our garden. |
Cheers
Pete
No comments:
Post a Comment